Alterations to fixtures such as changed playing time or change in venue can be captured through the Alterations report. The Alterations report will display any fixture that has been identified as changed at it's now current state.
Tick theĀ Publish Alterations checkbox beside a fixture to allow for an export to be run identifying which fixtures, if any, had alterations. If this checkbox is unticked, the fixture will not be included when running the alterations report to be exported.
The alterations report is exported through the draws and results export function, click here for more information.